Welcome to
TCRT Testing Center of Railway Vehicle and Track Interaction GmbH

The Testing Center was established in 2008 to meet the growing needs of railway equipment manufacturers in quality independent product tests. To date, more than 50 units of rolling stock have been tested by the Testing Center and a large number of research and construction works have been carried out.

The team of the Testing Center has an extensive experience in testing of various types of rolling stock - locomotives, electric and diesel trains, freight and passenger cars, special rolling stock and their components, as well as turnouts and their components, elements of the track structure in Europe and CIS countries. The Testing Center performs unique tests: with speeds of more than 250 km / h; determining the influence of various factors on the operation of the track and its interaction with rolling stock - for high-speed and freight traffic, with various structures of the upper structure, as well as climatic and weather factors; the influence of wheel surface defects.